Maximum Structural Integrity for Fire Reserve
This is the premium, specialized variant of the Bidirectional Arc-Ribbed Super Rigid SW Water Tank, engineered explicitly for critical fire water reserve applications. The designation "Double-Sided" emphasizes that the high-strength arc-rib profile is optimized on both the vertical and horizontal axes to manage the extreme hydrostatic pressures and dynamic forces associated with large fire water volumes.
The "Ultra-Stiff" nature minimizes panel deflection, which is critical for maintaining joint integrity over decades, ensuring the fire water reserve is always fully contained and available for the Vertical Multi-Stage Fire Pumps or Horizontal Split Case Fire Pumps.
Specification Table: Ultra-Stiff Arc-Ribbed Tank
| Function | Critical Fire Water Reserve Storage (Highest Reliability) |
| Structural Feature | Patented Double-Sided (Bidirectional) Arc-Ribs |
| Rigidity | Maximum Panel Stiffness (Minimal Hydrostatic Deflection) |
| Material | HDG Steel or High-Grade 304 SS |
| Seismic Resistance | Enhanced Design for High-Seismic Zone Requirements |
| Compliance | Mandatory Fire Code Volume and Durability Standards |
| Application Height | Ideal for High-Lift / High-Pressure Applications |
| Lifespan | Engineered for Extended Service Life (Minimum 30+ years) |
Application Fields
- Fire water storage for critical infrastructure (power plants, data centers, airports).
- High-volume fire reserves in seismic zones or areas with high wind loading.
- Dedicated fire compartment in a Domestic/Fire water tank where maximum reliability is paramount.
- Base structure for the Mingxing Buried Integrated Fire Pump Station (using BDF Composite).
- Any application where the consequence of fire water system failure is extremely high.
Engineering and Custom Fabrication
We provide third-party verification of the structural analysis (FEA) confirming the tank's seismic and wind-load ratings for the client's peace of mind and regulatory submission.
Customization Scope: Fully customized to meet the exact fire reserve volume required by the fire hazard analysis. Options for full BDF composite construction for subterranean applications.