Bidirectional arc ribbed prefabricated box pump integrated water supply pump station is a high-tech product combining bidirectional arc ribbed SW water tank + pump room (Internet of Things complete set + control cabinet) + intelligent cloud platform. The product is mainly suitable for the construction projects of new, reconstruction and expansion projects, and can replace the traditional concrete pool and pump house.
Inquiry
Product Description
Large rigidity
The rigidity is more than 3 times higher than that of the traditional large module plate
No tension, easy to clean
Subvert the traditional internal structure of the water tank, realize the water tank without horizontal tension, greatly improve the efficiency of on-site installation, reduce the difficulty of maintenance and cleaning
Long service life
Welding free, does not affect the material structure, water tank life and building life is consistent, up to 50 years
Forward reserve side continued to fight
Near and long-term combination, long-term continuation on the reserved splicing surface of the built water tank, low carbon and efficient
The box board of the fire tank and the enclosure board of the pump room should be made of the same material, and the hot galvanized steel plate, stainless steel plate or composite steel plate composed of hot galvanized steel plate and stainless steel plate should be used. The steel plate should be molded and stretched into a standard specification module at the factory;
The box board module of the fire water tank and the enclosure board module of the pump room should adopt specifications such as 0.5mx1.0m, 1.0mx1.0m, 1.0mx2.0m, 1.0mx3.0m, 1.0mx4.0m, etc. The thickness of the plate should meet the requirements of structural strength.
The bolts and nuts used for the packing board or enclosure board should be made of steel hot-dip galvanized or stainless steel. Rubber gaskets should be lined between the box plates of the fire water tank and the envelope plates of the pump room, and the material should be EPDM or silicone rubber.
The construction cost of 1000 water tanks is 12 million yuan, which is the same as the cost of manual cleaning in two years, and it is more economical when it is equipped with water quality testing.
1000 water tanks, automatic cleaning construction cost of 32 million yuan, the same as six years of manual cleaning cost, when equipped with water quality testing, more economical.
Retain the advantage that stainless steel is not easy to rust
Easy to install, avoid welding
No tension inside the water tank, automatic no cleaning
No horizontal joint, less leakage
High safety level
Construction Cases
Contact Us for More Details
Don't hesitate to contact when you need us!
Process principle of hot-dip galvanizingHot-dip galvanizing is not a simple surface coating operation, but a complex process based on the principles of metal metallurgy. When the stamped standard wa...
READ MOREJiangsu Mingxing Water Supply Equipment Co., Ltd. has been focusing on the field of domestic water supply equipment for many years and will bring its latest developed fire protection & life system...
READ MOREDual pump mutual backup design: ensure uninterrupted sewage discharge The Sewage Lifting Device is equipped with two high-performance water pumps and adopts a mutual backup design concept. This desig...
READ MORE